This weekend we built the dormer walls and put on most of the rafters.
On Saturday it was cold and rainy.
On Sunday it was incredibly hot.
The volunteers who came to help in both conditions went above and beyond.
There was a lot a hammering and ladder moving.
It’s time for a nap.
Pingback: BIG Art; Tiny House Post No. 8: Sheathing the Roof | Miranda's Hearth()
Pingback: ICQ Chat()
Pingback: Satta Matka()
Pingback: porno()
Pingback: seks izle()
Pingback: reserver hotel pas cher()
Pingback: porno()
Pingback: ankara kevasesi necat aktas()
Pingback: buy backlinks()
Pingback: BIG Art; Tiny House – Sixth Building Weekend (unedited)()